[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[SCIGN-0176] COSO downtime/antenna change
- Subject: [SCIGN-0176] COSO downtime/antenna change
- From: Jeff Behr
- Date: 25 Apr 1996 15:56:06
******************************************************************************
SCIGN Electronic Mail Thu Apr 25 15:56:06 PDT 1996 Message Number 0176
******************************************************************************
Author: Jeff Behr
Subject: COSO downtime/antenna change
Notice of antenna change at COSO site:
The China Lake site (COSO) will be experiencing some downtime on the
25th, 26th and 29th of April as the DMA does some local ties for the
Geothermal Crustal Motion Network installed by the Geothermal Program
Office. The Z-XII installed at the site will be taken offline from
approximately 8:30 AM to 2:30 PM (15:30-21:30 UTC) on each of these
days.
At the end of the survey on April 29, the DMA will install an Ashtech
Choke Ring antenna to permanently replace the L1/L2 P antenna presently
in use. This will complete the conversion of PGGA Ashtech sites to the
Choke Ring model.
We will pass along the new antenna height as soon as it is reported to
us by DMA personnel.
Jeff Behr
Scripps
[Mailed From: behr@abi.ucsd.edu (Jeff Behr)]